9th August 2021
The drainage run at Galmpton was completed today!
We have a good stream of water coming out of the pipe which we believe is from a spring which the railway cutting has cut though. We are seeing around 500 litres per hour travel though the pipe which previously would have gone straight onto the track - and if that had occurred it would have reduced the life of the track asset.