Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • Delightful - The staff were all very friendly and the captain kept us entertained with his 'dad jokes' throughout. Recommend 100% for all ages. Great trip. Thank you.
  • A big thumbs up... - A great time was had by all. The staff were really friendly and great at explaining. We took the steam train then hopped onto the boat where we spent some time in Dartmouth. It's a lovely touch that even the dog gets a ticket. The views from the steam train were so pretty the train and boat were both very clean and comfortable. A big thumbs up from us!
  • Fantastic visit - We chose to do the steam train and river cruise and it was fantastic. The staff were very helpful. After using the ferry to cross the river we went to find somewhere to have a snack before getting onto the cruise. The commentary was brilliant and we were pointed out different landmarks throughout the cruise. Thank you Dartmouth Steam Railway.

Read more reviews on TripAdvisor