Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • Trip back in time - What a fantastic experience. The train ride from Paignton is a gentle trip with stunning views. Arriving in Kingswear you can almost imagine how people in days gone by must have felt. A short ferry ride takes you into Dartmouth which is a stunning little town.
  • Lovely day out - We decided on a steam train and boat ride day. The train was lovely, and the boat ride was a lot of fun with an entertaining guide, which one of my teenage daughters found hilarious!
  • So organised - So well organised. All had seat reservations and the coaches were extremely clean. The river cruise did not disappoint and without doubt one of the best commentaries I have ever heard. Without exception everyone enjoyed the day out, and thought it was the highlight of our holiday. A credit to all.

Read more reviews on TripAdvisor