Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • Sunny days - The river cruise was a delight, such a fun and knowledgeable crew member giving the commentary, really is a must if visiting the area.
  • Lovely day out - We decided on a steam train and boat ride day. The train was lovely, and the boat ride was a lot of fun with an entertaining guide, which one of my teenage daughters found hilarious!
  • An A+ family experience! - >Excellent time< We arrived at the station to friendly welcome and were greeted by a jolly bloke who gave us an upgrade to a cabin on our own which made us feel like Harry Potter! He gave us lots of info about timings and what amount of time we had been given to allow us to make sure we got back okay. A great time.

Read more reviews on TripAdvisor