Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • Nostalgic - We included a cruise on our trip and spent an hour on the paddlesteamer (the captain pointing out some interesting features and telling a few stories along the way). This was a very enjoyable day and worth every penny.
  • Excellent trip out - On recommendation from our hotel in Torquay we booked this and we were not disappointed. Steam train then ferry over to Dartmouth + a lovely river cruise for an hour included. We will visit again.
  • So organised - So well organised. All had seat reservations and the coaches were extremely clean. The river cruise did not disappoint and without doubt one of the best commentaries I have ever heard. Without exception everyone enjoyed the day out, and thought it was the highlight of our holiday. A credit to all.

Read more reviews on TripAdvisor