Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • A thoroughly enjoyable day out - I was very impressed with the organisation, it was always very clear where we were supposed to go and what time we were supposed to be somewhere - would happily do it again.
  • Lovely day out - We decided on a steam train and boat ride day. The train was lovely, and the boat ride was a lot of fun with an entertaining guide, which one of my teenage daughters found hilarious!
  • Agatha Christie country - The ride on the train is beautiful right along the coast & Dart valley. You can also take your well behaved dog. I would highly recommend this excursion, we go every time that we are in Devon, it is not to be missed.

Read more reviews on TripAdvisor