Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • Stunning views - The views from the boat were stunning and the handy (and hilarious) commentary by the crew helped point out things of local interest. Loved it :)
  • Atmospheric steam train - We took the steam train from Paignton to Kingswear and then the ferry to Dartmouth (inc in the ticket). It was a trip back in time and most enjoyable, despite the very rainy weather! Good value for money.
  • All lovely - All done very well. Everything clean (train/boats), staff friendly and commentary on the river cruise added a bit of fun. Really good day out, lots of families. Take hats, drinks and dogs! If you have one.

Read more reviews on TripAdvisor