Rail grinding

17th August 2021

During another regular maintenance check, the gap between the rail and the rubbing face of the check (rear side of the check rail) was found to have been reduced due to rail lipping. The lip had to be removed to increase the gap to ensure trains are safely able to travel over this set of switch and crossing.

The purpose of a check rail is to guide the train wheel to the correct side of the crossing in order to guide the train on to another line.

Back to News & updates

Reviews

  • So organised - So well organised. All had seat reservations and the coaches were extremely clean. The river cruise did not disappoint and without doubt one of the best commentaries I have ever heard. Without exception everyone enjoyed the day out, and thought it was the highlight of our holiday. A credit to all.
  • An A+ family experience! - >Excellent time< We arrived at the station to friendly welcome and were greeted by a jolly bloke who gave us an upgrade to a cabin on our own which made us feel like Harry Potter! He gave us lots of info about timings and what amount of time we had been given to allow us to make sure we got back okay. A great time.
  • Fantastic visit - We chose to do the steam train and river cruise and it was fantastic. The staff were very helpful. After using the ferry to cross the river we went to find somewhere to have a snack before getting onto the cruise. The commentary was brilliant and we were pointed out different landmarks throughout the cruise. Thank you Dartmouth Steam Railway.

Read more reviews on TripAdvisor